Build #70
build.yml
on: workflow_dispatch
Test with SPM
4m 22s
Test with carthage
4m 38s
Test with cocoapods
3m 5s
Matrix: Build demo
Matrix: Build framework
Annotations
14 errors
|
Build demo (ChartsDemo-macOS, platform=macOS)
Process completed with exit code 65.
|
|
Build demo (ChartsDemo-iOS, OS=16.2,name=iPhone 14 Pro)
The strategy configuration was canceled because "build-demo.ChartsDemo-macOS_platform" failed
|
|
Build demo (ChartsDemo-iOS, OS=16.2,name=iPhone 14 Pro)
The operation was canceled.
|
|
Build framework (OS=16.2,name=iPhone 14 Pro, build test)
Process completed with exit code 70.
|
|
Build framework (OS=16.1,name=Apple TV 4K (3rd generation), build test)
The strategy configuration was canceled because "build-framework.OS_16_2_name_iPhone_14_Pr" failed
|
|
Build framework (OS=16.1,name=Apple TV 4K (3rd generation), build test)
The operation was canceled.
|
|
Build framework (platform=macOS, build)
The strategy configuration was canceled because "build-framework.OS_16_2_name_iPhone_14_Pr" failed
|
|
Build framework (platform=macOS, build)
The operation was canceled.
|
|
Test with SPM
The run was canceled by @pmairoldi.
|
|
Test with cocoapods
The run was canceled by @pmairoldi.
|
|
Test with cocoapods
The operation was canceled.
|
|
Test with carthage
The run was canceled by @pmairoldi.
|
|
Build
The run was canceled by @pmairoldi.
|
|
Test with carthage
The operation was canceled.
|