[stable27] feat: allow to provide manual URL #598
test-master.yml
on: pull_request
Matrix: test-master
test-master-summary
2s
Annotations
6 errors
|
test-master (8.2)
Process completed with exit code 2.
|
|
test-master (8.0)
The operation was canceled.
|
|
test-master (8.0)
The strategy configuration was canceled because "test-master._8_2" failed
|
|
test-master (8.1)
The operation was canceled.
|
|
test-master (8.1)
The strategy configuration was canceled because "test-master._8_2" failed
|
|
test-master-summary
Process completed with exit code 1.
|