Skip to content

Conversation

@zhengd-nv
Copy link
Collaborator

@zhengd-nv zhengd-nv commented Jul 15, 2025

PR title

The default timeout in test_workers.py is not always sufficient and lead to flaky fails in CI. This PR aligns the server start timeout with test_disaggregated.py's 900s.

The change is already applied to 0.21 in #5827 but is missed in mass integration.

Description

Please explain the issue and the solution in short.

Test Coverage

GitHub Bot Help

/bot [-h] ['run', 'kill', 'skip', 'reuse-pipeline'] ...

Provide a user friendly way for developers to interact with a Jenkins server.

Run /bot [-h|--help] to print this help message.

See details below for each supported subcommand.

Details

run [--disable-fail-fast --skip-test --stage-list "A10-1, xxx" --gpu-type "A30, H100_PCIe" --add-multi-gpu-test --only-multi-gpu-test --disable-multi-gpu-test --post-merge --extra-stage "H100_PCIe-[Post-Merge]-1, xxx"]

Launch build/test pipelines. All previously running jobs will be killed.

--disable-fail-fast (OPTIONAL) : Disable fail fast on build/tests/infra failures.

--skip-test (OPTIONAL) : Skip all test stages, but still run build stages, package stages and sanity check stages. Note: Does NOT update GitHub check status.

--stage-list "A10-1, xxx" (OPTIONAL) : Only run the specified test stages. Examples: "A10-1, xxx". Note: Does NOT update GitHub check status.

--gpu-type "A30, H100_PCIe" (OPTIONAL) : Only run the test stages on the specified GPU types. Examples: "A30, H100_PCIe". Note: Does NOT update GitHub check status.

--only-multi-gpu-test (OPTIONAL) : Only run the multi-GPU tests. Note: Does NOT update GitHub check status.

--disable-multi-gpu-test (OPTIONAL) : Disable the multi-GPU tests. Note: Does NOT update GitHub check status.

--add-multi-gpu-test (OPTIONAL) : Force run the multi-GPU tests. Will also run L0 pre-merge pipeline.

--post-merge (OPTIONAL) : Run the L0 post-merge pipeline instead of the ordinary L0 pre-merge pipeline.

--extra-stage "H100_PCIe-[Post-Merge]-1, xxx" (OPTIONAL) : Run the ordinary L0 pre-merge pipeline and specified test stages. Examples: --extra-stage "H100_PCIe-[Post-Merge]-1, xxx".

For guidance on mapping tests to stage names, see docs/source/reference/ci-overview.md.

kill

kill

Kill all running builds associated with pull request.

skip

skip --comment COMMENT

Skip testing for latest commit on pull request. --comment "Reason for skipping build/test" is required. IMPORTANT NOTE: This is dangerous since lack of user care and validation can cause top of tree to break.

reuse-pipeline

reuse-pipeline

Reuse a previous pipeline to validate current commit. This action will also kill all currently running builds associated with the pull request. IMPORTANT NOTE: This is dangerous since lack of user care and validation can cause top of tree to break.

@zhengd-nv
Copy link
Collaborator Author

/bot run --add-multi-gpu-test

@tensorrt-cicd
Copy link
Collaborator

PR_Github #11897 [ run ] triggered by Bot

@tensorrt-cicd
Copy link
Collaborator

PR_Github #11897 [ run ] completed with state SUCCESS
/LLM/main/L0_MergeRequest_PR pipeline #8818 completed with status: 'SUCCESS'
Pipeline passed with automatic retried tests. Check the rerun report for details.

@Shixiaowei02 Shixiaowei02 merged commit 385af53 into NVIDIA:main Jul 16, 2025
3 checks passed
@zhengd-nv zhengd-nv deleted the worker-test-timeout branch July 16, 2025 08:29
evezhier pushed a commit to evezhier/TensorRT-LLM that referenced this pull request Jul 16, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants